1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
babymother [125]
2 years ago
5

PLEASE HELP

Mathematics
1 answer:
stiv31 [10]2 years ago
5 0

Answer:

I think it would be 34 because I divided 68.2 by 4 and got 17.05, so I multiplied that by 2, and it's closest to 34.

<em>So I think it's A.</em>

But y'all don't be mad if I'm wrong cuz I said I think.

You might be interested in
8<br> .<br> y = 3x - 2<br> m=<br> b=
yan [13]

Answer:

m is 3 since it's the slope and b is -2 since its the y-intercept

Step-by-step explanation:

the formula is y=mx+b so 3 is in the m spot and -2 is in the b spot.

5 0
2 years ago
Read 2 more answers
a customers total bill is $50.50. The company charges a monthly fee of $28 plus 5 cents for each call. Use n to represent the nu
Doss [256]
.05n + $28 = $50.50

(.05n = $22.50)100

5n = 2250

n= 450 calls
7 0
3 years ago
Ax + By = C represent the lineAn egg is dropped straight down from a diving board whose end is 7 ft from the edge of the pool, w
Katen [24]

Answer:

  A = 1, B = 0, C = 7

Step-by-step explanation:

The egg follows the path x = 7, so the equation is ...

  1x +0y = 7

A = 1, B = 0, C = 7

6 0
2 years ago
Read 2 more answers
PLAESE HELP ASAP!!!!
vovikov84 [41]
11 5/8 + 9 1/2= 21 1/8
3/4 - 2/5= 7/20
4 5/6 - 2 1/2= 2 1/3
I think these are right, I apologize if they are wrong.
5 0
2 years ago
Read 2 more answers
The production manager is going to present this information to the company's board of directors. Which graph should the manager
viktelen [127]

To best emphasize the number of defects. Manager should use graph 3 (refer the image shown):

If we talk about graph 1, it can also be used but usually we put the time line on the horizontal axis, for the convenience and the quantity to be measured on the y-axis. In the graph 1, the time is placed on the vertical axis (x-axis) so it would not be a good pick for the manager.

Same is the case with graph 2 again we have time on the vertical axis. So it is not a good idea to with graph 2.

Graph 3 could be the best to emphasize the number of defects because first of all time is placed on the horizontal axis and the quantity to be shown is on the vertical axis. Secondly, the range of the vertical axis is less so it is easy to observe the data set on the graph quite distinctively. Therefore, graph 3 is the best pick.

Graph 4 is placed correctly in terms of vertical and horizontal axes but the range of vertical axis is quite high due to which the dispersion or the display of the data is quite compressed and it gets hard to visualize.

3 0
3 years ago
Read 2 more answers
Other questions:
  • Bobby’s uncle gave him 300 baseball cards. Each week, Bobby purchases 40 baseball cards to add to his collection.
    12·2 answers
  • Can someone please please help me with this question???
    7·1 answer
  • Every smoothie sold contains 0.5 cups of strawberries. How many smoothies can be sold using 3.25 cups of strawberries?
    10·2 answers
  • D/3+10=7 solve problem
    12·1 answer
  • Mount Everest measures 8,849 meters in elevation and the elevation of the Caspian Sea is -28 meters what’s is the difference in
    10·1 answer
  • A ball is thrown downward with an initial velocity of 35 meters per second from a
    13·1 answer
  • Sandi's
    12·1 answer
  • Elizabeth spent $77.69 at the school supply store. She then had $24.50
    15·1 answer
  • Alysa is solving the question below
    14·1 answer
  • 2px3qx5r someone answer please
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!