Answer:
thanks for the points! have a wonderful day! ☺☺☺☺☺☺☺☺⭐⭐⭐⭐⭐⭐
Answer:
Step-by-step explanation:
Given that ;
Carlos needs 1.7 meters of wire for one project &
0.8 meters of wire for another project
we are to shade the model to represent the total amount of wire Carlos needs .
NOW;
For both projects ; Carlos needs ( 1.7 + 0.8) meters of wire = 2.5 meters of wire
In the attached files below. the first picture shows the diagram attached to the question and the second one shows the shading of the model which represent the total amount of wire Carlos needs.
As the sample size, "n", increases, the standard error of the mean becomes SMALLER.
Answer:
table D
Step-by-step explanation:
the value in the y axis moves by the same amount each time.