1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
WITCHER [35]
3 years ago
10

Which of these are steps in the testing cycle? Check all of the boxes that apply.

Computers and Technology
2 answers:
Sati [7]3 years ago
7 0

Answer:

A and D

Explanation:

ollegr [7]3 years ago
5 0

Answer:

A,C and D

Explanation: You're welcome

You might be interested in
On which tab is the function library group located in excel
Neko [114]

The function library group is located in the "formulas" tab

7 0
4 years ago
Read 2 more answers
Select the correct answer. Arcade games such as Donkey Kong, Mr. Do! , and Venture were adapted from arcade titles to home conso
Andrew [12]

Answer:

D. Magnavox

hgjvyihbnjbuhklnk. hvgvjnm;lkbhkvkbl.

4 0
4 years ago
1. When adding text to an Excel worksheet, which option displays the Word window features? A. Text box B. There are no options t
shepuryov [24]
I'm gonna say A, hope it's right.
6 0
4 years ago
(Best Buy Part A) At a Best Buy store, the forecast for the annual demand of a Motorola cell phone is 15600. Demand forecasts ar
Nataly_w [17]

Explanation:

a. The computation of the economic order quantity is shown below:

= \sqrt{\frac{2\times \text{Annual demand}\times \text{Ordering cost}}{\text{Carrying cost}}}

= \sqrt{\frac{2\times \text{\15,600}\times \text{\$400}}{\text{\$5}}}

= 1,580 units

The carrying cost is

= $50 × 10%

= $5

b. The number of orders would be equal to

= Annual demand ÷ economic order quantity

= 15,600 ÷ 1,580

= 9.87 orders

Ordering cost = Number of orders × setup cost per order

= 9.87 orders × $400

= $3,949.37

c. The average inventory would equal to

= Economic order quantity ÷ 2

= 1,580 units ÷ 2

= 790 units

Carrying cost = average inventory × carrying cost per unit

= 790 units × $5

= $3,950

c. Now the total cost

= Setup cost + carrying cost

= $3,949.37 + $3,950

= $7,899.37

8 0
3 years ago
A computer has a pipeline with four stages. each stage takes the same time to do its work, namely, 1 nsec. how many instructions
prisoha [69]

In figuring, a pipeline, otherwise called an information pipeline, is a lot of information preparing components associated in arrangement

Further explanation:

In figuring, a pipeline, otherwise called an information pipeline, is a lot of information preparing components associated in arrangement, where the yield of one component is the contribution of the following one. The components of a pipeline are frequently executed in parallel or in time-cut style.

Instruction travelling:

999,999,997 guidelines for each second. The pipeline has 3 nsec of straightforward figurings, at that point finishes a guidance in each ensuing nsec.  

3nsec (for first guidance to go down the pipeline).10^9 ns every second. 10^9 – 3 = 999999997 directions.

Instruction per second:

MIPS - Million guidelines for each second  

Million guidelines for each second (MIPS) is a more established, outdated proportion of a PC's speed and power, MIPS measures generally the quantity of machine directions that a PC can execute in one second.

Per second:

Million directions for each second (MIPS) is a more established, old proportion of a PC's speed and power, MIPS measures generally the quantity of machine guidelines that a PC can execute in one second. Be that as it may, various directions require pretty much time than others, and there is no standard strategy for estimating MIPS. Moreover, MIPS alludes just to the CPU speed, while genuine applications are commonly constrained by different elements, for example, I/O speed

Answer Details:

Subject: Computer and technology

Level: College.

Key Words:

Further explanation:

Per second:

Instruction per second:

Instruction travelling:

For further Evaluation:

brainly.com/question/6362387

brainly.com/question/12938965

6 0
4 years ago
Read 2 more answers
Other questions:
  • Write a program that receives a series of numbers from the user and allows the user to press the enter key to indicate that he o
    11·1 answer
  • Gus has decided to organize his inbox on June 26th by using folders and deleting irrelevant messages
    10·2 answers
  • You are required to copy in your attendees' emails from outside of Outlook when creating a meeting
    6·2 answers
  • What is the action take to the input called?
    15·1 answer
  • Editing is the process of cutting out the bad parts. True or false?
    7·2 answers
  • Because filling a pool/pond with water requires much more water than normal usage, your local city charges a special rate of $0.
    14·1 answer
  • Convert 10101010 into decimal number system​
    13·2 answers
  • Jeni is using the Label Wizard to solve a problem. What problem was she most likely experiencing?
    13·1 answer
  • What is utility Software​
    14·1 answer
  • A team member who does not feel comfortable disagreeing with someones opinion in front of the team would most likely come from a
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!