Answer:
14 plants.
Step-by-step explanation:
Answer:
45
Step-by-step explanation:
180 - 135 = 45
The measure of angle 2 is 45.
-0.3 is the. correct answer.
Use point slope equation y-y1=m(x-x1) Remember that a parallel line has the same slope.
y-1= -3(x-(-2))
y-1= -3(x+2)
y-1= -3x-6
y= -3x-5
Final answer: y=-3x-5
For large sample confidence intervals about the mean you have:
xBar ± z * sx / sqrt(n)
where xBar is the sample mean z is the zscore for having α% of the data in the tails, i.e., P( |Z| > z) = α sx is the sample standard deviation n is the sample size
We need only to concern ourselves with the error term of the CI, In order to find the sample size needed for a confidence interval of a given size.
z * sx / sqrt(n) = width.
so the z-score for the confidence interval of .98 is the value of z such that 0.01 is in each tail of the distribution. z = 2.326348
The equation we need to solve is:
z * sx / sqrt(n) = width
n = (z * sx / width) ^ 2.
n = ( 2.326348 * 6 / 3 ) ^ 2
n = 21.64758
Since n must be integer valued we need to take the ceiling of this solution.
n = 22