The answer is d :) have a good day
Answer:
1) 5.44, 2) 3.9
Step-by-step explanation:
1) a/b + 2b - a^2 when a = 1.4 and b = 0.2
plug in the values:
1.4/0.2 + 2(0.2) - (1.4)^2 = 7 + 0.4 - 1.96 = 5.44
2) a[b-2c]^3 - d/e when a = 2, b = -0.75, c = -1, d = 0, e = -12 5/7 (rewritten to -89/7 = 12.71)
again, plug in the values:
2[-0.75-2(-1)]^3 - 0/12.71 = 2[1.25]^3 - 0 = 2[1.95] = 3.9
A and b can do a piece of work in 12 days. If a alone have to finish the job among b and c so
A and b=12
A (24 days alone without b)
So if b and c 15 days and c 20 days. If a have to do all I would add 24 and 15 and 20 which would be 59 days
Step-by-step explanation:
1 cubic decimetre = 1000000 milimetres
Answer:
Dilation.
Step-by-step explanation:
From the given picture , it can be seen that the size of trapezoid P'Q'R'S' is decreased from trapezoid PQRS .
Reflection , rotation and translation are rigid motions that produces congruent images and do not change the size of the shapes.
But dilation is not a rigid motion because it changes the size of the shape by using a scale factor.
Hence, the transformation maps trapezoid PQRS onto trapezoid P'Q'R'S' is "Dilation".