Answer:
52.63% probability that thids intial repair was made by the first technican
Step-by-step explanation:
Bayes Theorem:
Two events, A and B.

In which P(B|A) is the probability of B happening when A has happened and P(A|B) is the probability of A happening when B has happened.
In this question:
Event A: Incomplete repair
Event B: Made by the first technican.
The first technican, who services 40% of the breakdowns, has 5% chance of making incomplete repair.
This means that
.
Probability of an incomplete repair:
5% of 40%(first technican) or 3% of 60%(second technican). So

Given that there is a problem with the production line due to an incomplete repair, what is the probability that thids intial repair was made by the first technican

52.63% probability that thids intial repair was made by the first technican
Answer:
It should be J
Step-by-step explanation:
The line is solid indicating it is a greater than/less than/equal relationship and the shaded area indicated a positive y (so greater than)
Answer:
The weight of the block of ice after 1 day is of 4.81 pounds.
Step-by-step explanation:
Equation for exponential decay:
The equation that models an amount after t hours, subject to exponential decay, is given by:

In which A(0) is the initial amount and r is the decay rate, as a decimal.
A 10-pound block of ice melts at a rate of 3% per hour.
This means that 
So



Find the weight of the block of ice after 1 day.
One day has 24 hours, so this is A(24).

The weight of the block of ice after 1 day is of 4.81 pounds.
Answer:
Answer: One solution
Step-by-step explanation: