Answer:
Yellow, green, polka dot and white jerseys
Explanation:
Tour de France is the biggest bicycle race in the world held at France over a period of 23 days. At the end of each day of racing they give to the certain riders FOUR different colored jerseys:
- The yellow jersey is given to the overall winner at each stage, this shows the rider who was the best in the previous stage.
- The green jersey is given to the best sprinter of each stage,
- The polka dot jersey is given to the rider who first reach the crest of designated hills and mountains at each stage.
- The white jersey is given to the fastest rider at each stage under 25 years at the beginning of the racing year.
At the end of the competition, the total points are counted and the different jerseys are given to the overall winners.
Answer:
Total work done is 2606.08 J.
Explanation:
Given :
Mass of box , m = 23 kg .
Force applied , F = 100 N .
Angle from horizon ,
.
Coefficient of kinetic friction ,
.
Distance travelled by box , d = 34 m .
Now ,
Total work done = work done by boy + work done by friction.
Hence , this is the required solution.
Answer:
Time, t = 80 seconds
Explanation:
Given that,
The frequency of the oscillating mass, f = 1.25 Hz
Number of oscillations, n = 100
We need to find the time in which it makes 100 oscillations. We know that the frequency of an object is number of oscillations per unit time. It is given by :



t = 80 seconds
So, it will make 100 oscillations in 80 seconds. Hence, this is the required solution.
Answer: 1.4mi/hr²
Explanation:
Blank 1: We know that acceleration is the change in velocity/change in time
Using this, we know that the acceleration will be: (50-15)/25 = 1.4
Blank 2: mi/hr²
Answer:
1.53m
Explanation:
Given parameters:
Mass of box = 3kg
Gravitational potential energy = 45J
Unknown
Height of the box = ?
Solution:
To solve this problem;
Gravitational potential energy = mgh
m is the mass
g is the acceleration due to gravity
h is the height
45 = 3 x 9.8 x h
h = 1.53m