1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Ymorist [56]
2 years ago
12

The Regency Hotel has enough space at its entrance for six taxicabs to line up, wait for guests, and then load passengers. Cabs

arrive at the hotel every 8 minutes; if a taxi drives by the hotel and the line is full, it must drive on. Hotel guests require a taxi every 5 minutes, on average. It takes a cab driver an average of 3.5 minutes to load passengers and luggage and leave the hotel(exponentially distributed).
1. What is the average time a cab must wait for a fare?
2. What is the probability that the line will be full when a cab drives by, causing it to drive on?
Mathematics
1 answer:
maksim [4K]2 years ago
6 0

Answer:

The appropriate solution is:

(1) 22.81 minutes

(2) 0.171

Step-by-step explanation:

According to the question, the values will be:

The service rate of guess will be:

= 5+3.5

= 8.5 \ minutes

The mean arrival rate will be:

\lambda =\frac{60}{5}

  =7.5 \ cabs/hr

The mean service rate will be:

\mu= 7.05 \ cabs/hr

(1)

The average time a cab must wait will be:

⇒ W_q=22.95-\frac{1}{7.05}

⇒       =\frac{161.798-1}{7.05}

⇒       =\frac{160.798}{7.05}

⇒       =22.81 \ minutes

(2)

The required probability will be:

⇒ P(X\geq 6)=\frac{1-2.115}{1-7.5}

⇒                  =\frac{-1.1115}{-6.5}

⇒                  =0.171

You might be interested in
A small factory planned to produce a batch of men’s shirts in 8 days. But producing 10 more shirts per day than planned, they fi
a_sh-v [17]

In unit of batches over days, let r be the planned rate and R be the actual increased rate. The difference between R and r is described as 10 shirts per day.

R-r=10

                        Rate                  Time                  Batches

Planned              r                          8                           1

Actual                 R                         7                            1


\left[\begin{array}{c}r=1/8&R=1/7&R-r=HowManyBatchesInTenShirts\end{array}\right]

1/7-1/8, the number of batches equivalent to 10 shirts.

(1/56)*Batches=10*Shirts

OneBatch=560*Shirts

Hope This Helps!!!

4 0
2 years ago
What is the surface area of this composite solid?______________ square feet 242 319 363 517
jeka57 [31]

Answer:

<h2>The right answer is 415.4 cubic feet.</h2>

Step-by-step explanation:

As you can observe in the image attached, the composite figure is formed by a square prism and a pyramid on top.

We need to find the volum of each part separately.

<h3> Square prism.</h3>

V_{prims}=11 \times 11 \times 2=242 \ ft^{3}

<h3>Square pyramid.</h3>

First, we need to find the height of the pyramid. We already know the height of each triangular face of the pyramid, which divides equally the side.

Let's use Pythagorean's Theorem to find the height of the pyramid.

7^{2}=h^{2} +(5.5)^{2}\\  49-30.25=h^{2}\\ h=\sqrt{18.75} \approx 4.3

The height is 4.3 feet, approximately.

Now, we find the volume of the pyramid

V_{pyramid}=\frac{1}{3}(11 \times 11 \times 4.3) \approx 173.4ft^{3}

The sum of both figures represents the total volume of the composite figure

V_{total}=242+173.4=415.4ft^{3}

Therefore, the right answer is 415.4 cubic feet.

3 0
3 years ago
Read 2 more answers
The figure below is a square pyramid where the height of the pyramid is 2 centimeters and the volume is 24 cubic centimeters. If
Murrr4er [49]

Answer:

HIIIIIIII NMMNDKK F.

Step-by-step explanation:

4 0
2 years ago
An electrician charges $20 for a service call plus $40 per hour of service. Write an equation in slope-intercept form for the co
Zigmanuir [339]

Answer:

Step-by-step explanation:

Regular charge- $20                                      

Every hour of service cost- $40

Equation or slope intercept form-

C= 40h+20

Part 1-  20+40(8)=

40 multiplied by 8                320+20         = $340

Part 2-  20+40(10)=

40 multiplied by 10             400+20           = $420

5 0
3 years ago
I need help asap!! before 2:25 please and thank youu!!
Lena [83]

Answer:

B. (2, -1)

Step-by-step explanation:

Take tracing paper and mark the origin and point m. Rotate 90 degrees clockwise around the origin. Point m will be at (2, -1).

7 0
3 years ago
Other questions:
  • 6x+3-8x=12-7 <br><br>I need a step by step guide ​
    9·1 answer
  • Find the value of x that will make l and m 7x-7, 4x+14
    11·1 answer
  • Solve for x: 4x - 2 &gt; 6x + 8. (5 points)<br> x&lt;-5<br> x&gt;5<br> x&lt;5<br> x&gt;-5
    8·1 answer
  • PB is a line segment on a number line. It has endpoints at -2 and 12. what is the coordinate of its midpoint
    14·2 answers
  • 1.Which explanation justifies how the area of a sector of a circle is derived?
    5·1 answer
  • Sketch the graph of the function f(x) = -(x-4)^3 by indicating how a more basic function has been shifted, reflected, stretched,
    15·1 answer
  • I need an answer quickly!
    13·1 answer
  • Simplify.48 ÷ ((2 6) · 2) - 1
    7·1 answer
  • Katie is watching a helicopter flying at an altitude of 5 miles. If the angle of elevation is pi/3 , the distance between Katie
    13·1 answer
  • Alan mixes 1 1/3 cups of milk with a can of condensed soup. He makes a total of 2 5/8 cups of soup. How many cups of condensed s
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!