so 5 people work each one for 21 minutes, that means 21+21+21+21+21 minutes altogether, namely 105 minutes, it took that long for 7 walls, hmmmm how long for just one wall then? well, 105 ÷ 7, namely 15 minutes then, for just 1 wall.
now, if it takes 15 minutes of work to do one wall, what about 5 walls? well, that'd be 15*5 or 75 minutes.
so if we have 3 folks working, how much would each one work? well, 75 ÷ 3, namely 25 minutes, so each of them will work 25 minutes, namely 25+25+25 minutes, so in 25 minutes, they'll be done with 5 walls.
Answer:
2/3
Step-by-step explanation:
Answer:
(B) Time (min) 2 , 3 , 7 , 9
Temperature (°C) 60.6 , 64.3 , 79.1 , 86.5
Step-by-step explanation:
The rate of change is found by using the formula for slope:

For option A, this gives us
m =(64.4-61.0)/(3-2) = 3.4/1 = 3.4
This is not more than relationship A.
For option B, we have
(64.3-60.6)/(3-2) = 3.7/1 = 3.7
This is more than relationship A.
For option C, we have
(65.3-61.8)/(3-2) = 3.5/1 = 3.5
This is not more than relationship A.
For option D, we have
(64.6-61.0)/(3-2) = 3.6/1 = 3.6
This is not more than relationship A.
Were you not given a diagram?