Answer:
The equation for total cost function is
C(x)=100+270x
Step-by-step explanation:
Variable cost per per board =total cost per day-fixed cost per day/daily output
total cost per day is $5,500
fixed cost per day is $100
20 boards are produced per day
variable cost per board=($5,500-$100)/20=$270 per day
Total cost C(x)=fixed cost per day+ variable per board*number of daily output
Since daily output is represented also by x ,total cost function is given thus:
C(x)=100+270x
Answer:
Theorems
Step-by-step explanation:
Theorems is the right answer.
A circle is a geometric figure where all points on the circle keep equal distances from a point called the centre.
A circle has so many important properties.
The important of these are called theorems related to circles.
Some of the theorems are
i)Central angle theorem
ii) Opposite angles are supplementary for a cyclic quadrilateral, etc
Hence theorems would be the appropriate word for filling up the answer
Answer:
52
Step-by-step explanation:
You already said that DE=52.
Answer: 24 students
Explanation:
(20 + 23 + 25 + 28)/4
= 96/4
= 24
Therefore the mean is 24 students in the class.