1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
valentinak56 [21]
3 years ago
9

G(r)=-1-7r g(6)=?does anyone know the answer to this?

Mathematics
1 answer:
Lesechka [4]3 years ago
7 0

So for this, replace the r variable in the equation with 6 to solve:

g(6)=-1-7*6\\ g(6)=-1-42\\ g(6)=-43

You might be interested in
.<br> Which expression could be used to determine the product of -4 and 3 1/4?
lara31 [8.8K]

Expression: -4 * 3 1/4

Equation: -4 * 3 1/4 = -13.

3 0
3 years ago
Read 2 more answers
Point Y is the midpoint of segment XZ. If XY = 2(3x +1) and YZ = 5x + 22, find the value of x.
Ede4ka [16]
<h3>Point Y is the midpoint of segment XZ. Then value of x is 20</h3>

<em><u>Solution:</u></em>

Given that,

<em><u>Point Y is the midpoint of segment XZ</u></em>

XY = 2(3x +1)

YZ = 5x + 22

To find: Value of x

Since, Point Y is the midpoint of segment XZ,

Therefore,

XY = YZ

2(3x + 1) = 5x + 22

6x + 2 = 5x + 22

6x - 5x = 22 - 2

<h3>x = 20</h3>

Thus, value of x is 20

6 0
3 years ago
2 people can plough in a field for 6 hours
dangina [55]

Explanation:

Inverse Proportion.

Multiply, 2x6

The answer is 12.

Divide, 12 by 1

Divide l, 12 by 3.

<em>Overall</em><em> </em><em>Answer</em><em>:</em><em> </em>

<em>a</em><em>)</em><em> </em><em>1</em><em>2</em><em>.</em>

<em>b</em><em>)</em><em> </em><em>4</em><em>.</em>

4 0
3 years ago
Help help math I’ll give points thanks
LiRa [457]
The answer is x = 13

6 0
3 years ago
Read 2 more answers
how many cubic yards of concrete will be needed to replace a section of sidewalk 150ft long, 5ft wide and 4 inches thick
zepelin [54]

4 inches = 1/3 foot

So the volume of that section is  (150ft x 5ft x 1/3 ft) = 250 cubic feet

The whole trick to this question is knowing
how many cubic feet make 1 cubic yard.

1 yard = 3 ft

 (1yd x 1 yd x 1yd) = 1 yd³

(3ft x 3ft x 3ft) = (3 ft)³ = (3)³ x (ft)³  =  27 ft³    <===

For the sidewalk project,

               250 ft³  =  (250 / 27)  =  9.26 yard³ .

I think the way concrete contractors operate, they'll
want you to order and pay for 10 cubic yards.

7 0
3 years ago
Other questions:
  • Where stocks sre traded can be called any of these EXCEPT
    14·1 answer
  • On her science test, Shawn correctly answered 66 out of 78 questions. What percent of the questions did she answer correctly?
    5·2 answers
  • A stock-car race lasted 2.07 hours. how many seconds did the race last?
    6·1 answer
  • What is the mean (average) of the following data set? 3, 5, 7, 8, 9, 4, 2, 1, 3, 8 *
    10·1 answer
  • Order the numbers from least (top) to greatest (bottom). Move to Bottom -9 |-6| |-5| -4 |-3| |-2| |1
    5·1 answer
  • Factor 24 p + 64 <br><br> Find "m"<br> m+8=22
    15·1 answer
  • PLEASE HELP THIS IS MY LAST QUESTIONNNN
    5·2 answers
  • Using known properties, determine if the statements are true or not. Select True or False for each statement. If one pair of con
    5·1 answer
  • Please help! Brainliest to correct.
    15·1 answer
  • A cube has a surface area of 2646 cm squared what is its volume ​
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!