Box and whisker plots is not that hard, you first have to make a number line that at least has 3 points on it the middle point is Q2 quartile 2 the first dot is Q1 and the last is Q3, normally there is supposed to be 5 dots so the first number to the left is the lower quartile and the last dot to the left is the upper quartile.
I hope this was some kind of help
Answer:
6b+3m
Step-by-step explanation:
I hope this helped.
3427 + 65.75s = 5000 + 35.5s
65.75s - 35.5s = 5000 - 3427
30.25s = 1573
s = 1573 / 30.25
s = 52 seconds <== they are the same at 52 seconds
3427 + 65.75(52) = 6846
5000 + 35.5(52) = 6846
and their altitude is 6846 <===