30 or 3 and 4 weeks hope this helps
Answer: n = 14
Step-by-step explanation: margin of error = critical value × σ/√n
Where σ = population standard deviation = 1
n = sample size = ?
We are to construct a 99% confidence interval, hence the level of significance is 1%.
The critical value for 2 tailed test at 1% level of significance is gotten from a standard normal distribution table which is 2.58
Margin of error = 0.7
0.7 = 2.58×1/√n
0.7 = 2.58/√n
By cross multipying
0.7×√n = 2.58
By squaring both sides
0.7^2 × n = 2.58^2
0.49 × n = 6.6564
n = 6.6564/0.49
n = 14
Step-by-step explanation:
total working duration = 2 weeks
Working duration in hours = 38× 2= 76 hours
a) per year
24*3115.35 = $74768
b) 3115.35/2
$1557.675
c)
3115.35/76
$40.99
Answer:

Step-by-step explanation:
You can use the center of a circle to write an equation in vertex form. Vertex form is
and the vertex is (h,k). Notice (h,k) are the opposite sign in the equation then as the point.
Here h = -4 and k = 3. Substitute these values and the value r = 5.
