The critical path is A-B-C, with a duration of 15 minutes.
<u>Explanation</u>:
- The critical path is A-B-C, with a term of 15 minutes. You don't need to be knowledgeable in computer lingo to make sense of this one (as I made sense of it absent a lot of data on that half of the condition). Here's the manner by which I made sense of this.
-
The main thing I saw was that "predecessor" was utilized, which implies something precedes the other thing. That provided me the primary insight that A precedes B and C, and that B must precede C. Then, I just included the term times for the three ways, which allowed me 15 minutes.
Answer:
u will need good car parts and a very well made engine
Explanation:
u need a good engine because if u only work on the outer layer of the car the inner parts will be slow and old and the car will have problems
Answer:
The Meter bridge is the modification of Wheatstone's network used to determine the value of unknown resistance. The meter bridge consists of a thin, uniform, and homogenous conducting wire AC, rectangular wooden board between two thick L shaped metal strips C1 and C2 as shown in the diagram.
Answer:
The text file attached has the detailed solution of all the parts individually.
we can see that the correct person here will be Technician B who says that a diesel engine is designed to operate at near or maximum speed for long periods without damage.
<h3>What is a diesel engine?</h3>
A diesel engine is actually known to be an engine that makes use of diesel as its fuel. In other words, diesel engines run on diesel.
We see here that a diesel engine is actually designed to work for a very time on near or maximum speed without damage. This is true because the diesel fuel has that strength.
Also, diesel engines may be designed as two or four stroke cycles.
Learn more about diesel engine on brainly.com/question/13146091
#SPJ1