Answer = 13$
Explanation = This would mean each taco would be roughly 1.3$ since 4/3=1.333, so 1.3x10=13$
Answer:
(18+21+17+x)÷4=20
x=24 students
Step-by-step explanation:
(18+21+17+x)÷4=20
(56+x)÷4=20
56+x=20*4
56+x=80
x=80-56
x=24
Answer:
Time taken by the un powered raft to cover this distance is T = 192.12 hr
Step-by-step explanation:
Let speed of boat = u 
Speed of current = v 
Let distance between A & B = 100 km
Time taken in downstream = 32 hours


u + v = 3.125 ------ (1)
Time taken in upstream = 48 hours


u - v = 2.084 ------- (2)
By solving equation (1) & (2)
u = 2.6045 
v = 0.5205 
Now the time taken by the un powered raft to cover this distance

Because un powered raft travel with the speed of the current.

T = 192.12 hr
Therefore the time taken by the un powered raft to cover this distance is
T = 192.12 hr
Answer:
It is all determined by how many spaces and which way the decimal point moves.
Step-by-step explanation:
So here are two examples
<em>Example 1:</em>
500000.00
To write this in scientific notation you would move the decimal place to the left.
You would move it 5 digits to the left so the exponent of 10 would be 5

<em>Example 2</em>
0.0000042
Here to write this in scientific notation you move the decimal place to the right.
You would move it 6 digits to the right so the exponent would be -6

Answer:
<em>Worker B needs 9 days to finish the rest of the work</em>
Step-by-step explanation:
<u>Proportions</u>
Worker A finishes a project on his own in 12 days and worker B does the same in 16 days.
Worker A does 1/12 of the project in one day and worker B does 1/16 of the project in one day. When working together, they do

After 3 days they have completed:

parts of the project, this means it still remains:

parts of the project and it is done by B alone. Since B does
per day, he now takes

days to complete the project.
Worker B needs 9 days to finish the rest of the work