The answer to your question is 1/3
The tank is filling at
the rate of (58-36) in/(5-3 h) = 22/2 = 11 in/h.
72-58 = 14 inches more
to fill
<span>
The remaining 14 inches will be filled in
14 /11 = 1.27 , round to 1.3 hours</span>
so total time
would be 5 +1.3 = 6.3 hours
<span>3 is 1.0 below the mean. That is 1.0 / 0.9, or 1.1111... standard deviations below the mean.
So look up z < -1.11 on your graphing calculator.
It should be around 0.1335 or 13.35%</span>
Answer:
x = - 
Step-by-step explanation:
Given
- 2(4x + 3) = 3(x + 1) ← distribute parenthesis on both sides
- 8x - 6 = 3x + 3 ( subtract 3x from both sides )
- 11x - 6 = 3 ( add 6 to both sides )
- 11x = 9 ( divide both sides by - 11 )
x = - 