The answer is -166, your welcome
Answer:what goes around comes around
Step-by-step explanation:
"i need points too thanks"
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
<h3>How long does it take to fill the dam?</h3>
Given that;
- Amount of water needed to fill the dam A = 30000 litres
- Pump rate r = 75 litres per minute
- Time needed to fill the dam T = ?
To determine how long it take to fill the dam, we say;
Time need = Amount of water needed ÷ Pump rate
T = A ÷ r
T = 30000 litres ÷ 75 litres/minute
T = 400 minutes
Note that; 60min = 1hrs
Hence,
T = 6hours 40minutes
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
Learn more word problems here: brainly.com/question/2610134
#SPJ1
Answer: -4y^(2)+12y-8
Step-by-step explanation: Combine like terms
Answer:
Part 1 .
As per the given statement: In t hours the train has traveled s miles.
Distance of the train = s mile
Time = t hours
Formula for :
Speed of the train(v) = 
or
mph .....[1]
Substitute the value of t = 3 hours and s = 180 miles in [1], to solve for v;

Therefore, the speed of the train(v) is, 60 mph
Part 2.
Similarly,
The formula for speed of the train (v) is given by;

Substitute the value of t = 2.5 hours and s = 225 miles to solve for v;

Therefore, the speed of the train(v) is, 90 mph