Answer:
her pay would be $4,576,000
Step-by-step explanation:
if you do $2,000×52=$104,000×44=$4,576,000
Answer:
D. y - 7 = 11(x - 5)
Step-by-step explanation:
Use point slope form, y - y1 = m(x - x1), where m is the slope and (x1, y1) is a point on the line.
Plug in the given slope and point:
y - y1 = m(x - x1)
y - 7 = 11(x - 5)
So, the correct answer is D. y - 7 = 11(x - 5)
Answer:
Speed of the cheetah would be 28 m/sec
Step-by-step explanation:
Given:
Distance covered = 518 meters
Time taken = 18.5 seconds
To Find:
Speed of cheetah = ?
Solution:
We are given with the distance and time of the cheetah and we have to find the speed of the cheetah which we can find out by the formula i.e.
Distance = speed * time
Putting in the values
518 = speed * 18.5
Dividing both sides by 18.5
it gives us
518 / 18.5 = speed ∴ 18.5 / 18.5 = 1 and 1* speed = speed
28 m/sec = speed
Or Speed = 28 m/sec
Speed of the cheetah would be 28 m/sec
5 feet per seconds is 100 yards per hour. So 5 feet per 3 sec will be...?
Answer:sin(20)= LN/8
And COS(70)=LN/8
Step-by-step explanation: