1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
marusya05 [52]
3 years ago
11

The carpet for the office you completed cost $576. If you're using the same carpet in the new client's bedroom, how much will it

cost? Round up to the nearest whole dollar. (Hint: You may want to find the area of each room and the cost of the carpet per square foot.)
A. $360

B. $280

C. $64

D. $225

Mathematics
1 answer:
Temka [501]3 years ago
4 0

Answer:

D. 225

Step-by-step explanation:

You might be interested in
Which means the sum of w and 3.4 is greater than or equal to 10.5
zhuklara [117]
w+3.4 \geq 10.5

3 0
3 years ago
The graph of a quadratic function is called a
suter [353]

Answer:

PARABOLA

Step-by-step explanation:

The graph of a quadratic function is a PARABOLA.

5 0
3 years ago
The area of a football field is 57,600 square feet. If the width of the field is 4/9 the length, what is the length of the footb
MrRissso [65]

Answer:

360 ft

Step-by-step explanation:

<h3>Given</h3>
  • Area = 57600 ft²
  • Length = x
  • Width = 4/9x
<h3>Solution</h3>
  • A = lw
  • x*4/9x = 57600
  • 4/9x²= 57600
  • x² = 57600*9/4
  • x² = 129600
  • x = √129600
  • x = 360 ft
8 0
3 years ago
Interact if u in k12
brilliants [131]

Answer:

im in k12, hello and how are you on this fine day? :D

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
A manufacturer of skis produces two types: downhill and cross country. The times required for manufacturing and finishing each s
pogonyaev

Answer:

So to maximize profit 24 downhill and 20 cross country shouldbe produced

Step-by-step explanation:

Let X be the number of downhill skis and Y the number of cross country skis.

Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours

Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.

Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90

total finishing time taken = 0.5x+1.5 y≤42

Profit function

Z = 50x+50y

Objective is to maximize Z

Solving the two equations we get intersecting point is

(x,y) = (24,20)

In the feasible region corner points are (0.28) (36,0)

Profit for these points are

i) 2200 for (24,20)

ii) 1400 for (0,28)

iii) 1800 for (36,0)

So to maximize profit 24 downhill and 20 cross country shouldbe produced.

6 0
3 years ago
Other questions:
  • Round 425 to the nearest ten and to nearest hundred
    5·1 answer
  • I will give you 20 points
    12·1 answer
  • Read the word problem.
    7·2 answers
  • On a standardized test the final scores are calculated by averaging the math, science, and literature scores. Kelly’s math score
    10·1 answer
  • Please help...I can't really wrap my brain around this...
    5·1 answer
  • sebuah taman berbentuk persegi panjang dengan keliling (2x+24)m dan lebar (8-x)m. agar luas taman maksimum, panjang taman terseb
    5·1 answer
  • Couldn't show it all but help​
    6·1 answer
  • Help please!!!!!<br> Geometry
    12·1 answer
  • (a) By what least number must 27 be divided to make it perfect square​
    13·2 answers
  • Find the area of the shaded region.
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!