Answer:
a
The point estimate of the population mean is 
b
The 80% confidence level is 
c
There is 80% confidence that the true population mean lies within the confidence interval.
Step-by-step explanation:
From the question we are told that
The sample size is n = 18
The standard deviation is 
The sample mean is 
Generally the point estimate of the population mean is equivalent to the sample mean whose value is 
Given that the confidence interval is 80% then the level of significance is mathematically represented as



Next we obtain the critical value of
from the normal distribution table
The value is 
Generally the margin of error is mathematically evaluated as

=> 
=> 
Generally the 80% confidence interval is mathematically represented as

=> 
=> 
The interpretation is that there is 80% confidence that the true population mean lies within the limit
As you can see from the polygon, 70/10= 7.
The second polygon is an enlargement of the first one.
Just multiply 4*7 to get the answer.
4*7= 28
That's the answer!
I hope this helped you!
Brainliest answer is always appreciated!
Y - y1 = m(x - x1)
slope(m) = -5
(4,1)...x1 = 4 and y1 = 1
now we sub
y - 1 = -5(x - 4) <===
He would be spending less time because 2/3 is not a full number. Let's make an equation out of the: 2/3(m). Note: 3(2) means 3 times 2 and the m is the amount of miles biked last week. We could insert the number 3 to our equation. 2/3(3). Now if you do it the proper way, it is 2/3(3/1) and if you do the math it is 6/3 aka 2. And 2 is less than 3. So it is less time spent
Answer: $17,600
Step-by-step explanation:
find the value of 9% of 32,000 (Divide). Multiply that by 100. multiply by 5. Subtract the product by 32,000