4 weeks at 7 days per week = (4 x 7) = 28 days
28/-14 = - 2....so the average change is -2 per day
Choice C, because

So it's less than what she originally had (which isn't possible)
Answer:
15/2
Step-by-step explanation:
when dividing by fractions, we "flip and multiply"-- therefore:
3 ÷ 2\5 = 3 x 5/2
3 x 5/2 = 15/2
Answer:
2580 ft-lb
Step-by-step explanation:
Water leaks out of the bucket at a rate of
Work done required to pull the bucket to the top of the well is given by integral
Here, function
is the total weight of the bucket and water
feet above the bottom of the well. That is,
is the initial height and
is the maximum height of well. That is,
Find the work done as,


![&\left.=46x-0.05 x^{2}\right]_{0}^{60}](https://tex.z-dn.net/?f=%26%5Cleft.%3D46x-0.05%20x%5E%7B2%7D%5Cright%5D_%7B0%7D%5E%7B60%7D)


Hence, the work done required to pull the bucket to the top of the well is 
Answer:it’s b
Step-by-step explanation: