Answer:
1.282, -0.5244,...
Step-by-step explanation:
We know that Z is a standard normal variate with mean =0, and std dev =1
a) z-score separates the highest 10% from the rest of the scores
= 90th percentile = 1.282
b) z-score separates the lowest 30% from the rest of the scores
= 30th percentile = -0.5244
c) z-score separates the lowest 40% from the rest of the scores
= 40th percentile = -0.2533
d) z-score separates the lowest 20% from the rest of the score
=20th percentile = -0.8416
Answer:
16
Step-by-step explanation:
Simply plug in 2 for a, then 6 for b and substitute
(2+6)2
Then do order of operations to simplify PEMDAS
First what's inside the parenthesis
(8)2
Then multiply
16.
Value of x is 35°
Step-by-step explanation:
- Step 1: Since the line segment is a perpendicular bisector, the angle formed is equal to 90° and two triangles are also formed.
Find x using the property of triangles that sum of angles of a triangle is 180°
⇒ x° + 55° + 90° = 180°
⇒ x° + 145° = 180°
∴ x = 180 - 145 = 35°
Answer:The answer is 25 blocks
Step-by-step explanation: This is because if 17 and -8 are subtracted, you get 25.
Answer:
(7,9)
Step-by-step explanation:
Use the midpoint formula to find the midpoint of the line segment.