1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
AysviL [449]
3 years ago
8

As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly

operation to achieve an output of 260 units per 8-hour day. Task times and precedence relationships are as follows:
Task Duration (minutes) Immediate Predecessor
a 0.5 -
b 0.6 a
c 0.2 b
d 0.3 -
e 1.7 d
f 1.8 c
g 1.9 e, f

Do each of the following:

a. Draw the precedence diagram.
b. Determine the minimum cycle time, the maximum cycle time, and the calculated cycle time.
c. Determine the minimum number of stations needed.
d. Assign tasks to workstations on the basis of greatest number of following tasks. Use longest processing time as a tiebreaker. If ties still exist, assume indifference in choice.
e. Compute the percentage of idle time for the assignment in part d.
Business
1 answer:
Margaret [11]3 years ago
7 0

Answer:

a. Attached in the attachment

b.

1.Minimum Cycle Time = 1.9 minutes

2.Maximum Cycle Time = 7 minutes  

3.Calculated Cycle Time = 1.84 minutes    

c. Number of minimum Stations = 4

d. Attached in the attachment

e. Idle % = 5.70 %    

Explanation:

This problem is very interesting and really simple to solve. Just to have some basic definitions to remember.

We are told to calculate all the questions while keeping in mind the operation time = 8 hours = 8x60 minutes = 480 minutes. And required output units = 260 units/day.

First of all, we are asked to calculate the precedence graph for the data given.

a. NOTE:

Solution of a, which is the precedence graph is attached below in the attachment.

Secondly, we are asked to calculate:

1. Minimum Cycle Time

2. Maximum Cycle Time

3. Calculated Cycle Time

So,

b.

1. In order to calculate the minimum cycle time, we need to see the maximum task duration in the data given.

Minimum Cycle Time = Maximum task duration

Minimum Cycle Time = 1.9 minutes

2. In order to calculate the maximum cycle time, we need to see all the task times and add all of them together.

Maximum Cycle Time = ∑ (Task Times)

Maximum Cycle Time =  0.5+ 0.6+ 0.2+ 0.3+ 1.7+ 1.8+ 1.9

Maximum Cycle Time = 7 minutes        

3. In order to calculate the calculated cycle time, we need to plug in the values into the following formula:

Calculated Cycle Time =   Operational Time / Output (No. of required units per day)

Calculated Cycle Time = 480/260

Calculated Cycle Time = 1.84 minutes      

Thirdly, we are asked to calculate the minimum number of stations needed.

c. In order to calculated the minimum number of stations, we need to apply the following formula:

Number of minimum Stations = Sum of all task times / Minimum Cycle Time

Number of minimum Stations = 7 minutes / 1.9 minutes

Number of minimum Stations = 3.68 ≈ 4 Stations

Number of minimum Stations = 4

Fourthly, we are asked to assign tasks to workstations on the basis of greatest number of following tasks.

d. NOTE: Assigning task has been tabulated and attached in the attachment to this answer. Please refer to the attachment for this.      

Finally, we are asked to calculated the idle percentage.

e. In order to calculated the idle percentage, we need to apply the following formula:

idle percentage = Total Idle time/ (Calculated Cycle Time x No. of stations)

Total Idle time = 0.42

Idle % =   0.42/(1.84x4)

Idle % = 5.70 %    

         

You might be interested in
Which type of business offers the best chance for quick decision-making?
Marta_Voda [28]

Answer:

Explanation:

I think ether Corporation or Sole proprietorship

4 0
3 years ago
Read 2 more answers
Why would police file an affidavit of probable cause before a person is
Naya [18.7K]

Answer:

A

Explanation:

they have to know what the person is being arrested for

5 0
3 years ago
Read 2 more answers
What was the weighted average interest rate Colgate faced on its short-term borrowings in 2013? Enter with 1 decimal place and w
statuscvo [17]

Answer:

The weighted average interest rate that Colgate faced on its short-term borrowings in 2013 was:

2.2%.

Explanation:

On page 62 of its 10-K annual report for the fiscal year ended December 31, 2013, it specifically reported that "the weighted-average interest rate on short-term borrowings of $13 in 2013 and $54 in 2012 included in Notes and loans payable in the Consolidated Balance Sheets as of December 31, 2013 and 2012 was 2.2% and 1.0%, respectively."  To calculate the weighted-average interest rate, we multiply each loan amount by its interest rate to obtain the "per loan weight factor."  Then add the per loan weight factors together. Add the loan amounts together. Divide the "total per loan weight factor" by the "total loan amount," and then multiply by 100 to calculate the weighted average.

6 0
3 years ago
Consider a firm which produces T-shirts according to Q = L^0.5, where Q denotes output and L is labor input. The domestic wage i
Luden [163]

From the calculation below, the profit-maximizing labor input is 0.0625, and the profit of the firm is 0.125.

<h3>How do we determine profit-maximizing labor input and profit?</h3>

From the question, we can obtain:

R = Revenue = Q*P = L^0.5 * 1 = L^0.5

C = Cost = w * L = 2L

P = Profit = R - C = L^0.5 - 2L

To obtain the profit-maximizing labor input, the first derivative of P is taken, equated to zero, and we solve for L as follows:

P' = 0.5L^-0.5 - 2 = 0

0.5L^-0.5 = 2

L^-0.5 = 2 / 0.5

L^-0.5 = 4

L^(-0.5/-0.5) = 4^(-1/0.5)

L = 0.0625 ----> profit-maximizing labor input

The profit (P) of the firm can now be calculated by substituting L = 0.0625 into the P function as follows:

P =  0.0625^0.5 - (2 * 0.0625) = 0.125 --------> Profit of the firm

Learn more about profit function here: brainly.com/question/16866047.

#SPJ1

4 0
2 years ago
What is land as a factor of production?
marta [7]
Could be cause of trade , if you have land it is also good for crops which is production 
3 0
4 years ago
Other questions:
  • ________ data, or the facts and figures that have already been collected about the Coffee Collective prior to the research at ha
    15·2 answers
  • Cairns owns 80 percent of the voting stock of Hamilton, Inc. The parent’s interest was acquired several years ago on the date th
    9·1 answer
  • Ronnie operates a lawn-care service. On each day, the cost of mowing the first lawn is $15, the cost of mowing the second lawn i
    14·1 answer
  • Suppose one county in Missouri decides it wants to reduce alcohol consumption, so the county passes a law that raises the price
    13·1 answer
  • 3 of documents required by the department of trade and industry when registering private company
    15·1 answer
  • How do job agencies help you find a job and how does it work?
    10·1 answer
  • Summarize and contrast how work-based learning benefits the following groups: students, employers, and schools
    13·1 answer
  • Milo decides to invest $1,500 in a savings account every year at the beginning of the year for 10 years. Assuming an interest ra
    15·1 answer
  • A coupon bond that pays interest annually has a par value of $1,000, matures in 5 years, and has a yield to maturity of 12%. If
    14·1 answer
  • Brodrick Company expects to produce 20,000 units for the year ending December 31. A flexible budget for 20,000 units of producti
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!