Are the 63x and the y being added or multiplied?
Answer:
a
b
Step-by-step explanation:
From the question we are told that
The data is 87 91 86 82 72 91 60 77 80 79 83 96
Generally the point estimate for the mean is mathematically represented as
=>
=>
Generally the point estimate for the standard deviation is mathematically represented as
=>
=>
Answer:
1. x² + 3x - 5 = 0
2. x² - x = 3 x + 7
4. 7x² + 14x = 0
Step-by-step explanation:
A Quadratic equation takes the form;
ax² + bx + c = 0
a, b, c are constants and a cannot be 0.
Options 1 fits this;
x² + 3x - 5 = 0
Option 2 fits this as well;
x² - x = 3 x + 7
x² -x - 3x - 7 = 0
x² - 4x - 7 = 0
Option 4 fits this as well if c = 0.
7x² + 14x + 0 = 0
1.15(300).
Substitute k for 300, since the plane is flying 300 knots per hour, and k=knots per hour.
1.15(300)=345 miles per hour
After multiplying, 300 by 1.15, you get 345 miles per hour. This is the speed of the plane from Knots to MPH (Miles Per Hour).
Answer:
7 and 14
Step-by-step explanation: