Answer:
327.21 euros.
Step-by-step explanation:
Answer:
40
Step-by-step explanation:
1/2* 8 (4 + 6) equation
4 (10) simplify
40
Answer:
y = -x
Step-by-step explanation:
The line has a slope of -1 and it passes through point (0,0)
Taking another point (x,y) on the line;
Slope = change in y ÷ change in x
For our case; slope = 
Cross multiplying this gives;
y = -x
Answer:
The equation for total cost function is
C(x)=100+270x
Step-by-step explanation:
Variable cost per per board =total cost per day-fixed cost per day/daily output
total cost per day is $5,500
fixed cost per day is $100
20 boards are produced per day
variable cost per board=($5,500-$100)/20=$270 per day
Total cost C(x)=fixed cost per day+ variable per board*number of daily output
Since daily output is represented also by x ,total cost function is given thus:
C(x)=100+270x