Answer:
4(2x + 3)
Step-by-step explanation:
Given
8x + 12 ← factor out the common factor of 4 from both terms
= 4(2x + 3)
You have two choices.
The minimum possible cost to operate your bat factory for a day is $390,
and there are two quantities of bats that both cost that much.
One possibility:
Produce no bats at all per day. Zero. Nada. None.
Cost = 0.06(0)² - 7.2(0) + 390 = $390 per day.
The other choice:
Produce 120 bats per day.
Cost = 0.06(120²) - 7.2(120) + 390
= 0.06(14,400) - 7.2(120) + 390
= 864 - 864 + 390
= $390 per day.
If you produce any other number of bats in a day ... more than zero
but not 120 ... then it will cost you more than $390 to operate the factory
that day.
Answer:
3/10
Step-by-step explanation:
Just multiply all of the numerators (top numbers) and then multiple all of the denominators (bottom numbers)
2/3x3/4x3/5 would be 18/60 Then take any number that is a factor to both 18 and 60 and divide both numbers by that factor. I could use 2 or 3 or 6 because both 18 and 60 is divisible by any of these numbers. I will choose 3. I will divide the top and bottom of 18/60 by 3 to get 6/20, now I will divide the top and bottom of that number by 2 to get 3/10
Answer:
x= (2/5)-(2y/5) (Im not sure if this is what you need but this is the answer simplified)
Step-by-step explanation:
Move all terms that don't contain x to the right side and solve.
Answer:
the slope is 3/5
Step-by-step explanation:
and if you want the y intercept it's 4