true
Typically, the price charged must cover more than labor costs figured at an hourly rate. There may be costs related to rent, utilities, administration, equipment use and/or depreciation. These costs are often called overhead<span>.</span>
8.5b.
7a= 5a +3b
-5a -5a
2a = 3b
/2
a= 1.5b
Solve by substitution and you get;
8.5b=8.5b
Because of the lack of constants in the equation there isn't a definite answer.