Answer:
(3y + 5) / (y^2)
Step-by-step explanation:
Sorry it's not actually in fraction format. That little button thing is having troubles atm on my end. Hope this is okay
Answer:
0.726 is the probability that the project will be completed in 33 days or less.
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 30 days
Variance = 25 days
Standard Deviation,

We assume that the distribution of path length is a bell shaped distribution that is a normal distribution.
Formula:

P(completed in 33 days or less)
Calculation the value from standard normal z table, we have,

0.726 is the probability that the project will be completed in 33 days or less.
Answer:
jdnendndnndhehehrhejejrjrhrh
Step-by-step explanation:
fndndbdhdhdhddhdhdhcfbbdbddbdbdbd
hello hello hi good day?
Answer:
<u></u>
Explanation:
The text and the model are garbled.
This is the question amended:
<em />
<em>Hyun Woo is riding a ferris wheel. H(t) models his height (in m) above the ground, t seconds after the ride starts. Here, t is entered in radians.</em>
<em>H(t) = -10 cos(2π/150 t)+10</em>
<em />
<em>When does Hyun Woo first reach a height of 16 m?</em>
<em />
<h2>Solution</h2>
<em />
When <em>Hyun Woo reaches a height of 16 m</em> the <em>model </em>states:
- <em>16 = -10 cos(2π/150 t)+10</em>
<em />
Then you must find the lowest positive value of t that is a solution of the equation.
Solve the equation:
- <em>16 = -10 cos(2π/150 t)+10</em>
- t = 52.86s ≈ 53 s ← answer
Answer:
False
Step-by-step explanation:
A square and a parallelogram could have proportional sides but the angles would not be the same