1. Divide the target number of shirts, 12,600 by the company's rate of making the shirts. That is,
number of hours = 12,600 shirts/ (1200 shirts/6 hours)
= 63 hours
2. Determine the number of workdays for them to complete the shirts by dividing 63 hours by 9 hours/workday. This will give us an answer of 7 workdays.
Answer:
The answer to this is the last one, the on all the way at the bottom.
Step-by-step explanation:
This is because no 2 coordinates/points line up.
Answer:

Step-by-step explanation:
1) if the required straight line is 'l', the given point is A(a;b), then the required equation of line can be written in form:

where (x₁;y₁) is other point B, which belongs to the 'l';
2) from the equation it is possible to detect the coordinates of the perpendicular, they are (x₁-a;y₁-b);
3) if the given perpendicular is ax+by=5, then the coordinates of the vector (a;b) are coordinates of the vector, which belongs to the required line 'l', and then: x₁-a=a and y₁-b=b;
4) if to substitute the a=x₁-a and b=y₁-b into the required equation of line 'l', then:

5) finally, the equation is: ay=bx, or y=b/a *x (slope-interception form).
note: the suggested solution is not the only way.
3/4 x 7 =5 and 1/4 cup
1/4 x 7 = 1 and 3/4 cup
1/4 + 3/4 =1 cup
so 7 cups in total hope this helped:)! brainliest please:)?
Answer:
b=4/5 or 0.8
Step-by-step explanation:
4(B-6)+19=0
4b-24=-19
4b=5
b=4/5