Answer:
D. 41
Explanation:
101001 is in base 2.
To convert 101001 to base 10;
1*2^5+0*2^4+1*2^3+0*2^2+0*2^1+1*2^0
1*32+0*16+1*8+0*4+0*2+1*1
32+0+8+0+0+1
=41
Answer:
connect the sender with the desired recipients.
Explanation:
Integrated Marketing Communication (IMC) is a process through which organizations create seamless branding and coordination of their marketing and communication objectives with its business goals and target audience or consumers. The communication tools used in IMC are both digital and traditional media such as billboards, search engine optimization, magazines, television, blog, radio, webinars etc.
The communication channel used in IMC must connect the sender with the desired recipients.
The receiver is any individual who is able to read, hear or see and process the message being sent or communicated in the IMC communication process. Any interference the IMC communication process is known as noise.
An organization can analyze and measure the effectiveness of the IMC communication process by considering market share, sales, and customer loyalty.
Renewable energy is energy that is collected from renewable resources, which are naturally replenished on a human timescale, such as sunlight, wind, rain, tides, waves, and geothermal heat.
Alternative 1:A small D-cache with a hit rate of 94% and a hit access time of 1 cycle (assume that no additional cycles on top of the baseline CPI are added to the execution on a cache hit in this case).Alternative 2: A larger D-cache with a hit rate of 98% and the hit access time of 2 cycles (assume that every memory instruction that hits into the cache adds one additional cycle on top of the baseline CPI). a)[10%] Estimate the CPI metric for both of these designs and determine which of these two designsprovides better performance. Explain your answers!CPI = # Cycles / # InsnLet X = # InsnCPI = # Cycles / XAlternative 1:# Cycles = 0.50*X*2 + 0.50*X(0.94*2 + 0.06*150)CPI= 0.50*X*2 + 0.50*X(0.94*2 + 0.06*150) / X1= X(0.50*2 + 0.50(0.94*2 + 0.06*150) ) / X= 0.50*2 + 0.50(0.94*2 + 0.06*150)= 6.44Alternative 2:# Cycles = 0.50*X*2 + 0.50*X(0.98*(2+1) + 0.02*150)CPI= 0.50*X*2 + 0.50*X(0.98*(2+1) + 0.02*150) / X2= X(0.50*2 + 0.50(0.98*(2+1) + 0.02*150)) / X= 0.50*2 + 0.50(0.98*(2+1) + 0.02*150)= 3.97Alternative 2 has a lower CPI, therefore Alternative 2 provides better performance.