-2(x+5) OR 2(-x-5) I hope that helps if not please let me know!
Answer: 2.79 hours.
Step-by-step explanation:
Given that the function for the learning process is T(x) = 2 + 0.3 1 x , where T(x) is the time, in hours, required to produce the xth unit
To calculate the time for the new worker to produce 10 units, substitute 10 for x in the equation above.
T(x) = 2 + 0.31 (10)
T(x) = 2 + 3.1
T(x) = 5.1 hours
To calculate the time for the new worker to produce 19 units, substitute 19 for x in the equation above.
T(x) = 2 + 0.31(19)
T(x) = 2 + 5.89
T(x) = 7.89 hours
The time required for a new worker to produce units 10 through 19 will be
7.89 - 5.1 = 2.79 hours
Answer:
TWO BUCKS?? ballin on a budget
anyways, if there are 16 guests, the party would cost $50. sounds a lot more correct lol
You have separated the figure into three (3) parts. There are two squares (or rectangles on the bottom. Subtract 5 from 8 to find out the length of the side (right side). 8-5=3. Then subtract 3 from 8 (8-3=5). The new length is 5 ft. 5 multiplied by 5 is the area of one of the squares on the bottom (25 ft. squared). Multiply that by two to find the area of both the squares on the bottom (50 ft. squared).
There's also a rectangle on the top. The base is 15 ft. and the height is 3 ft. Remember that you subtracted 5 from 8 to find out the area of the two bottom squares. 15 multiplied by 3 is 45 (ft.)
Add 45 to 50 to get the area of the entire figure. (45+50=95 or 95 ft. squared).
95 ft. squared is the area of the entire figure. Hope this helped you.