Answer:
It's E. x > 6
Step-by-step explanation:
All the brothers would receive 1/4 of EACH pizza. No, multiply by three, and all the brothers would get a total of 3/12 pizzas!
Hope I helped!!
They will require between 18.42 and 31.58 minutes.
We want the middle 90%. The two probability values associated with this would be 0.95 and 0.05; this would leave 5% below and 5% above, giving us the middle 90%.
Using a z-table (http://www.z-table.com) we see that the z-score associated with an area to the left of 0.05 is between -1.64 and -1.65; since it is equally distant from both we will use -1.645.
The z-score associated with an area of the left of 0.95 is between 1.64 and 1.65; since it is equally distant from both we will use 1.645.
The formula for a z-score is
z = (X-μ)/σ
-1.645 = (X-25)/4
Multiplying by 4 on both sides,
-1.645(4) = X-25
-6.58 = X-25
Adding 25 to both sides,
-6.58+25 = X
18.42 = X
For the upper bound,
1.645 = (X-25)/4
Multiplying both sides by 4,
1.645(4) = X-25
6.58 = X-25
Adding 25 to both sides,
6.58+25 = X
31.58 = X
The times are between 18.42 and 31.58 minutes.
y = total snow accumulated
x = hours
the ground has 0.2 inches of snow before the data starts
y = 1.5x+0.2
0 hours = x = 0, so y = 0.2 inches
after 9 hours, we predict that 13.7 inches of snow will have accumulated
y = 1.5(9)+0.2 = 13.7