3.3x =29.04
to find x divide both sides by 3.3
x = 29.04 / 3.3
x = 8.8
Answer:
The time required them working together to shovel the snow is T = 1.428 hours
Step-by-step explanation:
Given data
Time taken by first person to shovel the snow
= 2 hours
Time taken by second person to shovel the snow
= 5 hours
Time taken by both persons to shovel the snow

Put all the values in above equation we get

T = 1.428 hours
Therefore the time required them working together to shovel the snow is T = 1.428 hours
B. 12% increase. Hope I helped ^^
The MAD for City 1 is 24.
The MAD for City 2 is 11 1/3.
The MAD for City 2 is less than the MAD for City 1, which means the average monthly temperatures of City 2 vary less than the average monthly temperatures for City 1.