Answer:
I think the answer is B.
Step-by-step explanation:
Answer: 2.79 hours.
Step-by-step explanation:
Given that the function for the learning process is T(x) = 2 + 0.3 1 x , where T(x) is the time, in hours, required to produce the xth unit
To calculate the time for the new worker to produce 10 units, substitute 10 for x in the equation above.
T(x) = 2 + 0.31 (10)
T(x) = 2 + 3.1
T(x) = 5.1 hours
To calculate the time for the new worker to produce 19 units, substitute 19 for x in the equation above.
T(x) = 2 + 0.31(19)
T(x) = 2 + 5.89
T(x) = 7.89 hours
The time required for a new worker to produce units 10 through 19 will be
7.89 - 5.1 = 2.79 hours
Answer:
4^3x=4^(4x+4)
Step-by-step explanation:
You can eliminate the first 2 options since those don’t make sense already, and the last option changed 64 to 2^6 which is correct, but when they changed the other side. They should have multiplied 8 to both x and 1 which would have made the whole term 2^(8x+8) and not 2^(8x+1). Left with the third option, 4 to the power of 3 is 64 so the left side makes sense, 4^3x=64^x, on the right side, 4^4 equals 256, so the whole exponent should multiply by 4 so from 256^(x+1) you get 4^4(x+1) giving 4^(4x+4) making the third choice the right answer.