The only correct answer is "D" 9X-3.
<span>in order to redraw a scale drawing with a new scale, here are the steps that you need to follow :
1. Measure up the current scale and the size of the drawing
2. Determine the ratio of the second scale
3. Adjust the size and dimension of the first drawing into the new scale based on the previously calculated proportion
Hope this helps. Let me know if you need additional help!</span>
Answer:
Time in which both companies charge same cost = 1.5 hour
Step-by-step explanation:
Given:
Fixed Variable
Premier Landscaping charges $15 $55
Ace Landscaping charges $65
Find:
Time in which both companies charge same cost:
Computation:
Assume in X time both companies charge same cost:
So,
Premier Landscaping total cost = Ace Landscaping total cost
⇒ $15 + $55(Time taken) = $65 (Time taken)
⇒ $15 = $65 (Time taken) - $55(Time taken)
⇒ $15 = $10 (Time taken)
⇒ Time taken = 1.5 hour
Time in which both companies charge same cost = 1.5 hour
Answer:
<h2>LA = 24 ft²</h2>
Step-by-step explanation:
In the base we have the right triangle. Use the Pythagorean theorem for to calculate the hypotenuse:

The Lateral Area is the sum of the areas of three rectangles:

The Lateral Area:

The first step for solving this expression is to write 6q as a difference.
8q² + 10q - 4q - 5
Now factor out 2q from the first part of the expression (8q² + 10q).
2q × (4q + 5) - 4q - 5
Extract the negative sign from the second part of the expression (-4q - 5).
2q × (4q + 5) - (4q + 5)
Lastly,, factor out 4q + 5 from the expression to find your final answer.
(4q + 5) × (2q - 1)
This means that the correct answer to your question is (4q + 5) × (2q - 1),, or option D.
Let me know if you have any further questions.
:)