1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
zysi [14]
3 years ago
14

What's

Mathematics
1 answer:
Misha Larkins [42]3 years ago
3 0

Answer:

3

Step-by-step explanation:

1+2 = 3

I hate these type of qn

lol

You might be interested in
3(3b +2)=-30 what is b =
ycow [4]
3(3b+2)=-30  perform indicated multiplication on left side...

9b+6=-30  subtract 6 from both sides

9b=-36  divide both sides by 9

b=-4
4 0
3 years ago
Katie's business is going so well she wants to expand and add a shirt. She makes an isosceles triangle logo like the one below.
OleMash [197]
I think u forgot to put pic for we can see the triangle
4 0
3 years ago
Read 2 more answers
The process standard deviation is 0.27, and the process control is set at plus or minus one standard deviation. Units with weigh
mr_godi [17]

Answer:

a) P(X

And for the other case:

tex] P(X>10.15)[/tex]

P(X>10.15)= P(Z > \frac{10.15-10}{0.15}) = P(Z>1)=1-P(Z

So then the probability of being defective P(D) is given by:

P(D) = 0.159+0.159 = 0.318

And the expected number of defective in a sample of 1000 units are:

X= 0.318*1000= 318

b) P(X

And for the other case:

tex] P(X>10.15)[/tex]

P(X>10.15)= P(Z > \frac{10.15-10}{0.05}) = P(Z>3)=1-P(Z

So then the probability of being defective P(D) is given by:

P(D) = 0.00135+0.00135 = 0.0027

And the expected number of defective in a sample of 1000 units are:

X= 0.0027*1000= 2.7

c) For this case the advantage is that we have less items that will be classified as defective

Step-by-step explanation:

Assuming this complete question: "Motorola used the normal distribution to determine the probability of defects and the number  of defects expected in a production process. Assume a production process produces  items with a mean weight of 10 ounces. Calculate the probability of a defect and the expected  number of defects for a 1000-unit production run in the following situation.

Part a

The process standard deviation is .15, and the process control is set at plus or minus  one standard deviation. Units with weights less than 9.85 or greater than 10.15 ounces  will be classified as defects."

Previous concepts

Normal distribution, is a "probability distribution that is symmetric about the mean, showing that data near the mean are more frequent in occurrence than data far from the mean".

The Z-score is "a numerical measurement used in statistics of a value's relationship to the mean (average) of a group of values, measured in terms of standard deviations from the mean".  

Solution to the problem

Let X the random variable that represent the weights of a population, and for this case we know the distribution for X is given by:

X \sim N(10,0.15)  

Where \mu=10 and \sigma=0.15

We can calculate the probability of being defective like this:

P(X

And we can use the z score formula given by:

z=\frac{x-\mu}{\sigma}

And if we replace we got:

P(X

And for the other case:

tex] P(X>10.15)[/tex]

P(X>10.15)= P(Z > \frac{10.15-10}{0.15}) = P(Z>1)=1-P(Z

So then the probability of being defective P(D) is given by:

P(D) = 0.159+0.159 = 0.318

And the expected number of defective in a sample of 1000 units are:

X= 0.318*1000= 318

Part b

Through process design improvements, the process standard deviation can be reduced to .05. Assume the process control remains the same, with weights less than 9.85 or  greater than 10.15 ounces being classified as defects.

P(X

And for the other case:

tex] P(X>10.15)[/tex]

P(X>10.15)= P(Z > \frac{10.15-10}{0.05}) = P(Z>3)=1-P(Z

So then the probability of being defective P(D) is given by:

P(D) = 0.00135+0.00135 = 0.0027

And the expected number of defective in a sample of 1000 units are:

X= 0.0027*1000= 2.7

Part c What is the advantage of reducing process variation, thereby causing process control  limits to be at a greater number of standard deviations from the mean?

For this case the advantage is that we have less items that will be classified as defective

5 0
3 years ago
You randomly select a marble from a bag.
AysviL [449]

Answer:

b is the answer

Step-by-step explanation:

3 0
3 years ago
The first steps in writing f(x) = 3x^2 -24x+10 in vertex form what is the function written in vertex form
Vika [28.1K]
F(x) = 3(x-4)^2-38 because finding the perfect square would get you f(x)+38=3(x^2-8x+16) and then finding the squareroot of that and moving the constant on the left back to the right would leave u with f(x)=3(x-4)^2-38
4 0
4 years ago
Read 2 more answers
Other questions:
  • Please help me!!! :(
    13·2 answers
  • Solve for y. <br> y – (–19) = 25<br> a. –44<br> b. –6<br> c. 6<br> d. 44
    7·1 answer
  • What is x2-12x+36 factored
    11·1 answer
  • A stack of one hundred twenty cards is placed next to a ruler, and the height of stack is measured to be
    10·1 answer
  • Solve the equation 4y + 228 = 352
    9·2 answers
  • 3.33 divided by what equals 2.24?
    9·1 answer
  • Solve each following addition and subtraction problems. 82+25+92=
    13·1 answer
  • Please help!! Its a review and i need at least a 90!!
    14·1 answer
  • Will give brainliest!! Using the measurements of the shapes.. determine the area and perimeter of the irregular polygon.
    7·2 answers
  • Find the value of x. Justify your answer.
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!