Answer: 120 days
Step-by-step explanation:
A can complete it in 16 days.
=100/16 =6.25%/day.
B has ten days to do it.
10% every day is equal to 100/10.
So they would each contribute 16.25 percent per day as a group.
then for six days,
16.25*6 =97.50percent
97.50% of the work has been finished, in other words.
The amount of work left is now 100-97.5 = 2.5.
C finishes up the remaining job in 3 days
3.5% in 3 days, to be exact.
Consequently, he will finish his entire project in 120 days.
[2.5 * 40 = 100 percent; 40 * 3 = 120 days]
Probability =
(number of ways it can come out the way you want it to)
divided by
(total number of ways it can come out).
Total number of ways it can come out =
number of bottles in the cooler
= (10 + 15 + 13) = 38 .
Number of ways it can come out the way you want it to =
(soda + lemonade)
= (10 + 15) = 25 .
Probability of coming out the way you want it to =
25 / 38 = about 65.8 % .
Answer:
<h3>
</h3>
Step-by-step explanation:
?
Now, Using Pythagoras theorem
plug the values
⇒
Evaluate the power
⇒
Swap the sides of the equation
⇒
Move constant to right hand side and change it's sign
⇒
Calculate the difference
⇒
Squaring on both sides
⇒
Hope I helped!
Best regards!
Answer:
<em>Neither A nor B</em>
Step-by-step explanation:
Neither set of order pairs represent a function, because none of the points have a correlating function throughout them.
No, to be a square each side has to be equal. but all squares are rectangles.