1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
ArbitrLikvidat [17]
3 years ago
6

10 POINTS PLEASE HURRY

Mathematics
2 answers:
Alex Ar [27]3 years ago
7 0

Answer:

Since there are an infinite number of lines through the center, the circle has an infinite number of lines of symmetry. When the circle is folded over a line of symmetry, the parts of the circle on each side of the line match up. This means that the parts of the circle on each side of the line must have the same area.

Step-by-step explanation:

Verizon [17]3 years ago
6 0
3,14.81/2 = 127.17
,,,,,,,,,

You might be interested in
HELP WILL MARK BRAINLIEST TO WHOEVER ANSWERS !!
Zanzabum
It lasted 13 minutes
5 0
3 years ago
What is 105,159 rounded to the nearest ten thousand
ludmilkaskok [199]
The answer will be 100,000 I hoped this helped;)
3 0
3 years ago
Read 2 more answers
mauricio estimates that the first module of the project could be completed in as few as 15 days or could take as many as 25 days
4vir4ik [10]

Answer:

<em>Most likely time, </em>according to PERT (Program evaluation and review technique).

Step-by-step explanation:

PERT is "a statistical tool used in <em>project management" (Program evaluation and review technique (2020), </em>in Wikipedia), and it is commonly used with CPM <em>(Critical Path Method)</em> to manage projects.

Inside PERT, there are different defined times to accomplished an activity in a project, that is:

  • An <em>optimistic time</em> or minimum time required to accomplished an activity, i.e., if everything goes better than normal, the activity is accomplished before expected.
  • A <em>pessimistic time, </em>a time quite the opposite to optimistic time.
  • A <em>most likely time</em>, or a time required to accomplished an activity if everything goes as expected or normally.
  • An <em>expected time</em>, an statistical estimation.

Considering the question, we have that the <em>time</em> when "the first module of the project could be completed":

  • "[...] in as few as 15 days"  is the <em>optimistic time</em>.
  • "[...] or could take as many as 25 days" is the <em>pessimistic time</em>.
  • "[...] but most likely will require 20 days" is the <em>most likely time</em>.

As a result, the <em>20-day estimate</em> is called the <em>most likely time</em> in the context of the PERT/CPM techniques.

3 0
3 years ago
Anita incorrectly wrote the equation z = w – 18 to describe the pattern in the table.
LiRa [457]

The 63 is the err in her explanation here.

5 0
2 years ago
Read 2 more answers
Given the triangle below, find the value of x
Nataliya [291]

Answer:

I think it is b I’m not quite sure though. Sorry if wrong…

Step-by-step explanation:

6 0
2 years ago
Other questions:
  • if 1 and a half inch represents 50 miles, how many inches are needed to represent 225 miles ? show all of your work
    5·2 answers
  • The stock of Company A gained 6% today to $126.14. What was the
    5·1 answer
  • Which one of these methods finds the volume of the given figure?? Please Help Me Asap!!!!!
    13·2 answers
  • Add, answer as a fraction: 1/15 + 3/12
    14·2 answers
  • Complete the statements about the cone,
    9·2 answers
  • What is the GCF of 6,42, and 12
    9·1 answer
  • What’s the rate of change for this table? Please explain and show your work.
    5·1 answer
  • Question 1.A desk drawer is shaped like a rectangular prism. The height of the drawer is 7 inches. The bottom of the drawer has
    12·2 answers
  • What is the solution of the system of equations shown in the graph below?
    10·1 answer
  • What is the relationship between Tan and slope
    14·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!