Answer:
250 batches of muffins and 0 waffles.
Step-by-step explanation:
-1
If we denote the number of batches of muffins as "a" and the number of batches of waffles as "b," we are then supposed to maximize the profit function
P = 2a + 1.5b
subject to the following constraints: a>=0, b>=0, a + (3/4)b <= 250, and 3a + 6b <= 1200. The third constraint can be rewritten as 4a + 3b <= 1000.
Use the simplex method on these coefficients, and you should find the maximum profit to be $500 when a = 250 and b = 0. So, make 250 batches of muffins, no waffles.
You use up all the dough, have 450 minutes left, and have $500 profit, the maximum amount.
150mi/3hrs = 50mph
400/50 = 8 hours
Check:
8hours * 50mi = 400 miles traveled
Answer:
Your answer would be x = 1/2
Step-by-step explanation:
1/x = 2
You would divide x on both sides...then they would cancel each other out.
But now you're left with...
1 = x•2
So, re-order the terms so constants are on the left
1 = 2x
Divide 2 on both sides...
Now you're left with
1/2=x or more practically it would be x = 1/2
Hope this helps!
Answer:
the answer is 16
Step-by-step explanation:
I had type into a calculator