Answer:
Null hypothesis : 
Alternate hypothesis : 
Step-by-step explanation:
To Find : State the hypotheses to be tested.
Solution
Mean = 72
Standard deviation = 20
N = 30
Claim : Shorney Construction Company bids on projects assuming that the mean idle time per worker is 72 or fewer minutes per day.
So, Null hypothesis : 
Alternate hypothesis : 
Answer:g/c
Step-by-step explanation:
If the ball is "starting" at 30 feet, then to get how high it went the bounce, we simply multiply 0.75 times 30, and to get the next bounce's height, is again (30*0.75)0.75, and so on.
so... the 0.75 or 3/4 is our "multiplier" to get the next term's value, or our "common ratio". So is just a geometric sequence, if the first term is 30, the common ratio is 0.75, what's the 4th term? Because the first bounce happens after the 30 feet, at the 2nd term, thus the 4th term is the 3rd bounce.
Circumference = pi*diameter
C = pi*20
C = 20pi
When I used my calculator to compute 20*pi, I get approximately 62.83185
This is somewhat close to what choice C is saying. The difference is that choice C has an extra 1 buried inside it. I'm not sure if your teacher made a typo.