The answer to that is true. There are other ways of saying it tho like to-mae-to or to-mat-o
Answer:
A.)
arr[0] = 10;
arr[1] = 10;
Explanation:
Given the array:
arr = {1,2,3,4,5}
To set the first two elements of array arr to 10.
Kindly note that ; index numbering if array elements starts from 0
First element of the array has an index of 0
2nd element of the array has an index of 1 and so on.
Array elements can be called one at a time using the array name followed by the index number of the array enclosed in square brackets.
arr[0] = 10 (this assigns a value of 10 to the index value, which replace 1
arr[1] = 10 (assigns a value of 10 to the 2nd value in arr, which replaces 2
Answer:
Reference type,generic type
Explanation:
Reference types are used by a reference that maintains a reference (address) to the object but not the object itself. Because reference kinds reflect the variable's address rather than the data itself, assigning a reference object to another does not copy the information. Instead, it produces a second duplicate of the reference, which relates to the same heap place as the initial value.
Examples of reference types are Classes, Arrays,, Interfaces etc.
A generic type is a generic class or interface that is parameterized over kinds. Essentially, generic types enable you to write a particular, generic class (or method) that operates with distinct kinds, enabling code to be reused.
The class Object describes the conduct of all Java objects. However, it does not describe the conduct of all Java data structures. That's because not all Java data structures are objects. Some of them are primitive values that can be stored in object variables, but they are not objects themselves.
Unlike object types, primitive types are not sub types or super types.
Answer:
Optimistic duration
Explanation:
The following three concepts are Project management concepts:
Optismitic duration: Estimation of the shortest duration of a task, taking into account the difficulty, etc.
Pessimistic duration: Estamation of the longest duration of a task, taking into account the difficulty, etc
Expected duration: Expected duration of a task, kind of a compromise between the optmistic duration and the pessimistic duration.
Which of the following is the estimate of the minimum amount of time it would take to perform a task?
The answer is Optimistic duration
Answer :
The output is attached below
Explanation:
The following formula needs to be entered into cell N5:
=IF($M5>=4,"Lead","Associate")