8 ÷ 544 = 0.0147058824, 544 ÷ 8 = 68
Q: What is the value of the upper quartile?
A: C 9
Hope this helps!!!
Answer:
1. x = 67.5
2. x = 2.5
3. x = 35.2
4. x = 2.0
5. x = 17.0
Step-by-step explanation:
Question 1
The proportion is set up in the form x/9 = 15/2. Multiply both sides by two to get rid of the two in the denominator on the right side. After doing so, multiply by 9 on both sides to get rid of the 9 in the denominator on the left:
2x/9 = 15
2x = 9(15)
Next solve for x:
2x = 135
x = 67.5
Question 2
The proportion is set up in the form 20/8.7 = 5.8/x. Multiply both sides by the second denominator, x, and then both sides by the first, 8.7. This will leave you with the work below:
20x/8.7 = 5.8
20x = 8.7(5.8)
Next, solve for x:
20x = 50.46
x = 2.523
Round to the nearest tenth:
x = 2.5
Question 3
The proportion is set up in the form 5/16 = 11/x. Multiply both sides by the second denominator, x, and then both sides by the first, 16. This will leave you with the work below:
5x/16 = 11
5x = 11(16)
Next, solve for x:
5x = 176
x = 35.2
Question 4
The proportion is set up in the form x/0.06 = 17/0.5. Multiply both sides by the second denominator, 0.5, and then both sides by the first, 0.06. This will leave you with the work below:
0.5x/0.06 = 17
0.5x = 17(0.06)
Next, solve for x:
0.5x = 1.02
x = 2.04
Round to the nearest tenth:
x = 2.0
Question 5
The proportion is set up in the form 29/x = 75/44. Multiply both sides by the second denominator, 44, and then both sides by the first, x. This will leave you with the work below:
29(44)/x = 75
29(44) = 75x
Next, solve for x:
1276 = 75x
x = 17.0133
Round to the nearest tenth:
x = 17.0
<span>Equation:
train distance + plane distance = 1300 miles
50x + 275x = 1300
x(325) = 1300
x = 4 hours
4x2=8
---
The trip took 8 hrs.</span>
Answer:
y = 1.50x + 4 ;
Step-by-step explanation:
Given that bike rental cost $4 plus $1.50 per hour
From the information given, the change in y per unit change in x is the value of the slope ;
Therefore, Given that total cost = y and x) number of hours
Change in cost per change in number of hours) 1.50 = slope ; intercept = constant = $4
The equation, in slope intercept form :
y = mx + c
y = 1.50x + 4