Answer: The area is 5024 yrd^2
Step-by-step explanation:
80 is the diameter to we need to divide it by 2 to find the radius
80/2= 40
A= 3.14* 40^2
A = 3.14 * 1600
A= 5024
Answer:
(3, 0) and (5, 0)
Step-by-step explanation:
we have

we know that
The x-intercepts are the values of x when the value of y is equal to zero
so
For y=0

The formula to solve a quadratic equation of the form
is equal to

in this problem we have
so

substitute in the formula





so
x=3, x=5
therefore
The x-intercepts are (3,0) and (5,0)
♥️♥️♥️♥️♥️♥️♥️♥️♥️♥️♥️♥️♥️♥️



♥️♥️♥️♥️♥️♥️♥️♥️♥️♥️♥️♥️♥️♥️
Answer:
C) 20 Speeders
Step-by-step explanation:
5 divided by 2 is 2.5
there are 2.5 speeders per hour
over the span of 8 hours just multiply
8x2.5=20
Answer:
When using this technique, the AOQ:
improves (AOQ becomes a smaller fraction).
Step-by-step explanation:
AOQ simply means Average Outgoing Quality, which improves with inspection. It is a part of an organization's Acceptance Sampling Plan, usually designed to meet product quality and risk level targets. The plan draws samples from a population of items. Then it tests the samples. It only accepts the entire population if the sample is considered good enough. It also rejects the population when the sample is poor enough. In the plan, information about sample size and critical acceptance or rejection numbers are clearly indicated. Acceptance sampling is common in most business environments because it has been found to be more economical than doing 100% inspection of incoming production input and output.