Cost of month plan = $40
Cost of minutes used = $0.45 after 700 minutes
Total cost = $48.10
Let x be the total minutes used
Total cost = 40 + 0.45(x - 700)
------------------------------------------------------------------
Form the equation and solve x
------------------------------------------------------------------
40 + 0.45(x - 700) = 48.10
40 + 0.45x - 315 = 48.10
0.45x - 275 = 48.10
0.45x = 48.10 + 275
0.45x = 323.10
x = 323.10 ÷ 0.45
x = 718
------------------------------------------------------------------
Answer: John had used 718 mins this month
------------------------------------------------------------------
Answer:
The slope of this line is 7/4 or 1.74 in decimal form.
m = 7/4 OR m = 1.75
Step-by-step explanation:
slope = y^2 - y^1 / x^2 - x^1
Let's pick any two points from the graph: (-1, -3) and (3, 4)
m = y^2 - y^1 / x^2 - x^1
m = 4 - (-3) / 3 - (-1)
m = 4 + 3 / 3 + 1
m = 7/4
m = 1.75
Answer:
whats the drawing.
Step-by-step explanation:
The z-score is calculated by the formula (x - mu)/sigma, where x is the value, mu is the mean, and sigma is the standard deviation.
They will each equal 1.5 pounds also known as 1 1/2 or 3/2.