Answer: -5
Step-by-step explanation: The common difference is the same number we are adding each time to get from one term to the next.
In this sequence, we are adding -5 each time
so our common difference is -5.
The maximum height is 144 feet.
The maximum height is the y-coordinate of the vertex. To find the vertex, we first use x = -b/2a. For our information, that is x=-64/2(-16) = -64/-32 = 2.
Now we substitute this into the equation:
y = -16(2²) + 64(2) + 80 = -64 + 128 + 80 = 144
<h2><u>Solution (1)</u> :</h2>
Given, to find A we have to :
- square m
- Add y to m²
- Subtract 7 from m² + y
From the question, the following equation can be formed :

Therefore, the formula for finding A = m² + y - 7
<h2><u>Solution (2)</u> :</h2>
The value of A we can derive from the formula is :

Value of m = 3 (given)
Which means :




Thus, the value of A = 2+y
Therefore, the value of A = <u>2+y</u>
The <em>correct answers</em> are:
It would take 5 months and she would save $250.
Explanation:
Let m be the number of months.
For the first way of saving, $200 up front and $10 each month, the expression would be
200+10m.
For the second way of saving, $100 up front and $30 each month, the expression would be
100+30m.
Setting them equal gives us the equation
200+10m = 100+30m
Subtract 10m from each side:
200+10m-10m = 100+30m-10m
200 = 100+20m
Subtract 100 from each side:
200-100 = 100+20m-100
100 = 20m
Divide both sides by 20:
100/20 = 20m/20
5 = m
It would take 5 months.
$200 up front and $10 each month for 5 months:
200+10m
200+10(5)
200+50
250
She would save $250.
Answer:
210 hours
Step-by-step explanation:
<u>Step 1: Make an expression</u>
(2/3 * 1575) / 5
<u>Step 2: Multiply</u>
(2/3 * 1575)/5
(1050) / 5
<u>Step 3: Divide</u>
(1050) / 5
210 hours
Answer: 210 hours