Answer:
I think its C im not really sure
The error bars are used to indicate the variability of the data presented in a graph.
There are several quantities that can be used to generate error bars in the graph. These are:
standard deviation
standard error
confidence interval
Usually, one standard deviation above and below the mean is used although it is advised to indicate which variability data is used to generate the error bars in the graph since the 3 quantity given are not equal.
Answer: B
Step-by-step explanation:
The only labeled angle is 111
We can conclude that angle 3 is also 111
1 and 2 are both less than 90
Therefore, 1 is 69, 2 is 69, and 3 is 111
When a problem comes along, you must whip it.
Answer:
7/96 m
Step-by-step explanation:
7/12 ÷ 8 = 7/96