Answer:
i figured it out the number is 12,316 if i am correct
{-8, 0, 8, 16} is the range
Answer:
250
Step-by-step explanation:
Number of labourers * Number of days worked = Total number of working days
Total number of working days to construct a 4km long road: 
Total mumber of working days to construct a 8km long road: 
Labourers: 20000 ÷ 80 = 250.
250 labourers are required.
Add 31 to both sides.
<span><span><span><span>3x</span>−31</span>+31</span>=<span>76+31
</span></span><span><span>3x</span>=107
</span>
Divide both sides by 3.
<span><span><span><span><span><span>3x/</span>3</span></span></span></span>=<span><span><span>107/3
</span></span></span></span><span>x=<span></span></span>
Answer:
18
Step-by-step explanation:
13.5 / 3 = 4.5
so 4 x 4.5 = 16 + 2 = 18