6.4$
Solution:
Divide 40 and 100(there must always be 100 when solving percentage) then it would be equal to 0.4
after it Multiply it to 16
so we get 6.4.
Answer: Gary needs to work more than 25hours for the week to earn above $400.
Step-by-step explanation:
For Gary to be paid $50 per week means he worked $50/ $15.50= 3.23 hours for the week.
To make over $400 this week he needs to work for
400/15.50 = 25.81 hours and more for the week to earn above $400
Answer:
D one solution.
Step-by-step explanation:
It's linear. It is going to have at most 1 solution
8 + x/6 = x/6 - 4 + 5x/12 Subtract x/6 from both sides
8 = -4 + 5x/12 Add 4 to both sides
8+4 = 5x / 12 Combine
12 = 5x / 12 Multiply both sides by 12
12 * 12 = 5x * 12 / 12 Cancel
144 = 5x Divide by 5
144/5 = 5x/5
28.8 = x
Answer:
A. y = 80x
B. g(x) = 80x
C. To graph the equation, plot a point at (0,0) and a point at (1,80). Connect the points. Continue adding points by moving up $80 and over 1 day.
Step-by-step explanation:
Part A:
To write an equation, use y= mx where m is the slope, x is the number of days, and y is the rent cost.
x and y remain the same in the equation.
To find m, use the slope formula with (5,465) and (7, 625).

It costs $80 a day.
The equation is y = 80x.
Part B:
Function notation replaces Y as g(x). So the equation is g(x) = 80x.
Part C:
To graph the equation, plot a point at (0,0) and a point at (1,80). Connect the points. Continue adding points by moving up $80 and over 1 day.
Answer:
the second one +1.5 m/s
Step-by-step explanation:
to find the velocity you need to find the slope of the two points then just put it into the time (s) and position (m) terms which equals +1.5 m/s