<span>1. The problem says that the is ratio 1:3:5 by weight and Talil wants to make 180 kg of concrete mix.
2. Therefore, you have:
1+3+5=9
180 kg/9=20 kg
3. Each of the 9 parts of the ratio weights 20 kg. So, to make 180 kg of concrete mix, he needs:
1x20 kg=20 kg of cement
3x20 kg=60 kg of sand
5x20 kg=100 kg of gravel
4. Talil has:
15kg of cement (Not enough)
85kg of sand (More than enough)
100kg of gravel (Enough)
</span><span>
Does Talil have enough cement , sand and gravel to make concrete mix?
</span><span>
The answer is: No, she does no have </span>enough cement , sand and gravel to make concrete mix.
To my best knowledge the slop that is increased is number 3 it is moving up in a slop and it is sloped.
Cable company marked up monthly cost by 6% .New cost = $63.6
cost before increase = 63.6 × 100/106
= $60
All you have to do is multiply 18.3 x 5.1
18.3×5.1=93.33
It will take 93.33 minutes to repair the entire section. Hope that helps!