1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
gizmo_the_mogwai [7]
3 years ago
11

I need help with this!!Please..​

Mathematics
1 answer:
vagabundo [1.1K]3 years ago
7 0

Answer:

What's the previous problem

Step-by-step explanation:

You might be interested in
Find value of k
insens350 [35]

Answer:

k=10BY DPING PROCESS IT BECOME

3 0
3 years ago
Does Anybody Know The Answer?
Taya2010 [7]

Yes. When a graph has more than one line it is a piece wise graph.

5 0
3 years ago
A survey of athletes at a high school is conducted, and the following facts are discovered: 33% of the athletes are football pla
sergejj [24]

Answer:   0.79 or 79%

Step-by-step explanation:

Given : The probability that the athletes are football players : P(A)=0.33

The probability that the athletes are basketball players: P(B)=0.66

The probability that the athletes play both football and basketball : P(A∩B)=0.20

Now, the probability that the athlete is either a football player or a basketball player is given by :-

P(A\cup B)=P(A)+P(B)-P(A\cap B)\\\\=0.33+0.66-0.20=0.79

Hence, the probability that the athlete is either a football player or a basketball player = 0.79

Or we can write it as 79%.

5 0
4 years ago
Read 2 more answers
Standard Cost Journal Entries Bellingham Company produced 4,600 units that require five standard pounds per unit at a $10.5 stan
Naddika [18.5K]

Answer:

Dr work-in-process      $ 241,500.00  

Cr materials                                            $236,250

Cr direct material quantity variance      $ 5,250.00  

Step-by-step explanation:

The cost of the materials using standard price per pound of $10.5 is computed below:

standard cost=4,600*5*$10.5=$241,500.00  

The above is debited to work in process account.

The actual cost of materials used =22,500*$10.5=$236,250.00  

Since the actual cost materials is $ 236,250.00  ,the materials ledger is credited with $ 236,250.00  

The direct material quantity variance=$241,500-$236,250=$5,250  

4 0
3 years ago
Is 50.1 repeating a rational or irrational number?
leonid [27]
Rational numbers can be written as a fraction
can be terminating or repeating decimal (terminating means a decimal that stops ex 5.873) 
so 50.1 repeating is a rational number
5 0
3 years ago
Other questions:
  • PLEASE HELP!!
    6·1 answer
  • Solve for x.<br>A. x =9<br>B. x = 3<br>C. x = 4<br>D. x = 27
    7·1 answer
  • Can someone please help me???!!!
    13·1 answer
  • Melinda goes bowling on saturday afternoons.She bowls three games and pays for shoe rental.Define a variable and write an expres
    5·2 answers
  • The equation through the point (-2, 5) and is parallel to the line with the equation y=2x+7
    10·1 answer
  • Write and solve an equation to find the value of x and the missing angle measures
    14·1 answer
  • How many real number solutions does the quadratic below have? y=2x^2-10x+6
    8·2 answers
  • In a 33' by 69.7' room, what is the diagonal length from corner to corner along the floor?
    14·1 answer
  • So what is it ? I cannot figure it out and need help
    10·2 answers
  • If f(x)=3x² - 4 and g(x)=x+2, find (f - g)(x).​
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!